Staff Priorities - Phil: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Maechlin (talk | contribs)
Maechlin (talk | contribs)
Line 2: Line 2:
* Sent NICS write-up on CS
* Sent NICS write-up on CS
* Responded to NSF writer with image permissions
* Responded to NSF writer with image permissions
* Send in permissions to NSF
* Develop Geoinformatics schedule of topics for calls
* Develop Geoinformatics schedule of topics for calls
* UCVM design review


== Today: ==
== Today: ==

Revision as of 16:25, 12 March 2013

Yesterday:

  • Sent NICS write-up on CS
  • Responded to NSF writer with image permissions
  • Develop Geoinformatics schedule of topics for calls
  • UCVM design review

Today:

  • Contact Carl Tape about CVM Meeting in July
  • SEISM engineering 12noon-1pm
  • Touch-base 1pm
  • Meeting YG 2pm
  • XSEDE Paper

Blocked:

  • No

Followups:

  • No

Pending:

  • Try BBP March 12 release
  • Complete adding new users to all systems
  • UCERF3.0 on Stampede plans
  • Ask when UCERF3 will be ready for CSEP
  • Discuss Arias Duration on bbp
  • Review the CVM evaluation differences between CVM-H 11.9.1 and CVM-H 11.9.0