Staff Priorities - Phil: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Maechlin (talk | contribs)
Maechlin (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday: ==
== Yesterday: ==
* CSEP call
* Call with Maureen
* CyberShake call
* SEISM telecon 11am
* Meeting with TJ and TH
* Yellowstone telecon 12noon
* Talk with Nolan on metadata
* oodt review
* Meeting with YG
* info to YG
* Talk with DG on amps calc and UCVM changes
* Stampede purge space
* Talk with Fabio on bband
* Review of Yellowstone ASD document


== Today: ==
== Today: ==
* Try cvmsi tests
* Try cvmsi tests
* SEISM Call 11am
* Contact Thorsten
* Yellowstone Call 12noon
* Contact MV about eew results
* Summarize Yellowstone
* Try BBP March 12 release
* Try BBP March 12 release
* Call with NICS proposal
* finalize call with NICS  
* Prepare for


== Blocked: ==
== Blocked: ==

Revision as of 16:42, 15 March 2013

Yesterday:

  • Call with Maureen
  • SEISM telecon 11am
  • Yellowstone telecon 12noon
  • oodt review
  • info to YG
  • Stampede purge space
  • Review of Yellowstone ASD document

Today:

  • Try cvmsi tests
  • Contact Thorsten
  • Contact MV about eew results
  • Summarize Yellowstone
  • Try BBP March 12 release
  • finalize call with NICS

Blocked:

  • No

Followups:

  • UCVM Datum issue with DG

Pending:

  • Complete adding new users to all systems
  • UCERF3.0 on Stampede plans
  • Ask when UCERF3 will be ready for CSEP
  • Discuss Arias Duration on bbp
  • Review the CVM evaluation differences between CVM-H 11.9.1 and CVM-H 11.9.0