Staff Priorities - Phil: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Maechlin (talk | contribs)
No edit summary
Maechlin (talk | contribs)
No edit summary
Line 6: Line 6:


== Today: ==
== Today: ==
* NWSC Allocation meeting with TJ
* Prepare data access
* Notice to group XSEDE allocation is available
* Notice to group XSEDE allocation is available
* Geoinformatics call 11am
* Geoinformatics call 11am

Revision as of 18:12, 8 April 2013

Yesterday:

  • NWSC Allocation turned in (response received)
  • Travel Day
  • GPU Calls 3pm


Today:

  • Prepare data access
  • Notice to group XSEDE allocation is available
  • Geoinformatics call 11am

Blocked:

  • No

Followups:

  • No

Pending:

  • Ask when UCERF3 will be ready for CSEP
  • Review the CVM evaluation differences between CVM-H 11.9.1 and CVM-H 11.9.0