Staff Priorities - Phil: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Maechlin (talk | contribs)
Maechlin (talk | contribs)
Line 6: Line 6:


== Today: ==
== Today: ==
* Prepare data access  
* Review data access examples
* Notice to group XSEDE allocation is available
* Finalize NICS Proposal
* Geoinformatics call 11am
* Finalize EarthCube trip
* Finalize XAB Trip
* Finalize Fairbanks Trip
* Finalize Mira Trip
* BBP 2pm
* GPU Call 3pm
* Announcement to groups about SCEC Press (test email lists)


== Blocked: ==
== Blocked: ==

Revision as of 18:35, 8 April 2013

Yesterday:

  • NWSC Allocation turned in (on Thurs) response received (on Friday) (no)
  • Material for NICS Proposal
  • BBP Call 2pm
  • GPU Calls 3pm

Today:

  • Review data access examples
  • Finalize NICS Proposal
  • Finalize EarthCube trip
  • Finalize XAB Trip
  • Finalize Fairbanks Trip
  • Finalize Mira Trip
  • BBP 2pm
  • GPU Call 3pm
  • Announcement to groups about SCEC Press (test email lists)

Blocked:

  • No

Followups:

  • Scott 1145am
  • Fabio 2pm

Pending:

  • Ask when UCERF3 will be ready for CSEP
  • Review the CVM evaluation differences between CVM-H 11.9.1 and CVM-H 11.9.0