Staff Priorities - Phil: Difference between revisions
From SCECpedia
Jump to navigationJump to search
No edit summary |
|||
| Line 1: | Line 1: | ||
== Yesterday: == | == Yesterday: == | ||
* Material for NICS Proposal | * Material for NICS Proposal | ||
* | * Finalizing EarthCube trip | ||
* | * Finalizing XAB Trip | ||
* Tested email lists | |||
* Announcement to groups about SCEC Press (test email lists) | |||
== Today: == | == Today: == | ||
* | * Readiness review feedback to Scott | ||
* Finalize Fairbanks Trip | * Finalize Fairbanks Trip | ||
* Finalize Mira Trip | * Finalize Mira Trip | ||
* | * Review data access examples | ||
* GPU Call 3pm | * GPU Call 3pm | ||
== Blocked: == | == Blocked: == | ||
Revision as of 17:06, 9 April 2013
Yesterday:
- Material for NICS Proposal
- Finalizing EarthCube trip
- Finalizing XAB Trip
- Tested email lists
- Announcement to groups about SCEC Press (test email lists)
Today:
- Readiness review feedback to Scott
- Finalize Fairbanks Trip
- Finalize Mira Trip
- Review data access examples
- GPU Call 3pm
Blocked:
- No
Followups:
- Scott 1145am
- Fabio 2pm
Pending:
- Ask when UCERF3 will be ready for CSEP
- Review the CVM evaluation differences between CVM-H 11.9.1 and CVM-H 11.9.0