Staff Priorities - Phil: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Maechlin (talk | contribs)
No edit summary
Maechlin (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday: ==
== Yesterday: ==
* GPU Telecon
* Repair and restore files to Mac Laptop
* SEISM Telecon
* BBP Call with PS and CG
* Contact NCAR
* GPU call with YC and Titan group
* Contact BW
* Contact CS scientists


== Today: ==
== Today: ==
* Update BBP processing estimates
* CSEP Telecon
* Confirm call with DM
*  
* Call LH
 
* Call CT
* BBP Call 2pm
* Blue Waters call 12pm
* Add users BW
* Finalize XAB travel
* CSEP External forecast review
* Laptop issues


== Blocked: ==
== Blocked: ==
Line 25: Line 16:


== Pending: ==
== Pending: ==
* Ask when UCERF3 will be ready for CSEP
* Review the CVM evaluation differences between CVM-H 11.9.1 and CVM-H 11.9.0
* CVM Evaluation system differences
* CVM Evaluation system differences
* SRC files posted for SGS
* SRC files posted for SGS

Revision as of 17:03, 17 April 2013

Yesterday:

  • Repair and restore files to Mac Laptop
  • BBP Call with PS and CG
  • GPU call with YC and Titan group

Today:

  • CSEP Telecon


Blocked:

  • No

Followups:

  • No

Pending:

  • CVM Evaluation system differences
  • SRC files posted for SGS