Staff Priorities - Scott: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Scottcal (talk | contribs)
No edit summary
Scottcal (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday ==
== Yesterday ==
*Blue Waters
*Blue Waters
**Reformatted GPU SGTs for calculating hazard curve
**Continued work on coscheduling
*Stampede
**Tested SeisPSA code - validated
**Calculated GPU hazard curve - matches almost exactly!
*Emailed GPU hazard curve results out
*Started zipping 2011-12 CyberShake runs
*Debugged various production run issues


== Today ==
== Today ==
*Blue Waters
*Blue Waters
**Back to work on coscheduling
**Test ExtractSGT code
**Get site list for Study 13.4, start the run
**Test coscheduling
*Email GPU hazard curve results out
*Monitor production runs
*Monitor zipping
*Monitor 2011-12 zipping, delete once files are tgz-ed
*Modify stage-out location to scec-04


== Blocked ==
== Blocked ==
Line 18: Line 17:


== Follow-ups ==  
== Follow-ups ==  
*GB call?
*With David
*CyberShake technical call





Revision as of 19:07, 22 April 2013

Yesterday

  • Blue Waters
    • Continued work on coscheduling
    • Tested SeisPSA code - validated
  • Emailed GPU hazard curve results out
  • Debugged various production run issues

Today

  • Blue Waters
    • Test ExtractSGT code
    • Test coscheduling
  • Monitor production runs
  • Monitor 2011-12 zipping, delete once files are tgz-ed

Blocked

  • No

Follow-ups

  • With David


Check on SA forward sim Email Stampede staff, let them know about node crashing solution Finish wiki entries for Stampede and Blue Waters validation

Areas of Responsibilities

  • CyberShake 1.4
  • Broadband CyberShake
  • Code migration