Staff Priorities - Scott: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Scottcal (talk | contribs)
No edit summary
Scottcal (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday ==
== Yesterday ==
*Blue Waters
*Blue Waters
**Continued work on coscheduling
**Worked on coscheduling - got extraction working, tracked seis_psa issue to PMC
**Tested SeisPSA code - validated
*Monitored production runs
*Emailed GPU hazard curve results out
*2011-12 zipping completed
*Debugged various production run issues
*Added CyberShake draft material to GB paper
*Found monitord insertion issue, emailed Karan


== Today ==
== Today ==
*Blue Waters
*Resolve issue with full PeakAmplitudes table on focal DB; restart runs when resolved
**Test ExtractSGT code
*Resolve monitord insertion issue
**Test coscheduling
*Delete 2011-12 workflow log directories
*Monitor production runs
*Work on GB paper
*Monitor 2011-12 zipping, delete once files are tgz-ed


== Blocked ==
== Blocked ==
*No
*Blue Waters down for maintenance


== Follow-ups ==  
== Follow-ups ==  
*With David
*GB call at 10:30
*CyberShake calls





Revision as of 17:08, 24 April 2013

Yesterday

  • Blue Waters
    • Worked on coscheduling - got extraction working, tracked seis_psa issue to PMC
  • Monitored production runs
  • 2011-12 zipping completed
  • Added CyberShake draft material to GB paper
  • Found monitord insertion issue, emailed Karan

Today

  • Resolve issue with full PeakAmplitudes table on focal DB; restart runs when resolved
  • Resolve monitord insertion issue
  • Delete 2011-12 workflow log directories
  • Work on GB paper

Blocked

  • Blue Waters down for maintenance

Follow-ups

  • GB call at 10:30
  • CyberShake calls


Check on SA forward sim Email Stampede staff, let them know about node crashing solution Finish wiki entries for Stampede and Blue Waters validation

Areas of Responsibilities

  • CyberShake 1.4
  • Broadband CyberShake
  • Code migration