Staff Priorities - Phil: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Maechlin (talk | contribs)
No edit summary
Maechlin (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday: ==
== Yesterday: ==
* Repair and restore files to Mac Laptop
* BBP Call with PS and CG
* BBP Call with PS and CG
* GPU call with YC and Titan group
* GPU paper turned in


== Today: ==
== Today: ==
* CSEP Telecon
* Finalize CME meeting
* Talk about workflows for BBP with Fabio
*  
*  



Revision as of 16:40, 29 April 2013

Yesterday:

  • BBP Call with PS and CG
  • GPU paper turned in

Today:

  • Finalize CME meeting
  • Talk about workflows for BBP with Fabio


Blocked:

  • No

Followups:

  • No

Pending:

  • CVM Evaluation system differences
  • SRC files posted for SGS