Staff Priorities - Phil: Difference between revisions
From SCECpedia
Jump to navigationJump to search
No edit summary |
No edit summary |
||
| Line 1: | Line 1: | ||
== Yesterday: == | == Yesterday: == | ||
* BBP Call with PS and CG | * BBP Call with PS and CG | ||
* GPU | * GPU paper turned in | ||
== Today: == | == Today: == | ||
* | * Finalize CME meeting | ||
* Talk about workflows for BBP with Fabio | |||
* | * | ||
Revision as of 16:40, 29 April 2013
Yesterday:
- BBP Call with PS and CG
- GPU paper turned in
Today:
- Finalize CME meeting
- Talk about workflows for BBP with Fabio
Blocked:
- No
Followups:
- No
Pending:
- CVM Evaluation system differences
- SRC files posted for SGS