Staff Priorities - Phil: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Maechlin (talk | contribs)
No edit summary
Maechlin (talk | contribs)
No edit summary
Line 9: Line 9:
* Prepare Q1 ShakeAlert report
* Prepare Q1 ShakeAlert report
* Follow-up with GB Paper  
* Follow-up with GB Paper  
*  
* Ergo check
* Update SEISM Metrics
* NCAR data sharing plans





Revision as of 16:44, 29 April 2013

Yesterday:

  • BBP Call with PS and CG
  • GPU paper turned in

Today:

  • Finalize CME meeting
  • Finalize Fairbanks meeting
  • Talk about workflows for BBP with Fabio
  • Prepare Q1 ShakeAlert report
  • Follow-up with GB Paper
  • Ergo check
  • Update SEISM Metrics
  • NCAR data sharing plans


Blocked:

  • No

Followups:

  • No

Pending:

  • CVM Evaluation system differences
  • SRC files posted for SGS