Staff Priorities - Fabio: Difference between revisions
From SCECpedia
Jump to navigationJump to search
No edit summary |
No edit summary |
||
| Line 1: | Line 1: | ||
== Yesterday: == | == Yesterday: == | ||
* | * Created combined bias plot code | ||
** | ** Post-processes realizations and creates a combined bias plot | ||
** | ** Showed results to CG, took suggestions | ||
** | ** Code finished and checked into svn | ||
** | * CSM Method | ||
** | ** Generated results for all 5 california events for part A | ||
* | ** Created combined plots, ranking file | ||
** Irikura | ** Sent results to JA | ||
* | ** Got code update from JA with fix to green's function generator bug | ||
* | ** Update BBP version, patch fixes GF code's bug | ||
* | * Irikura method | ||
** | ** Got filter details from JB | ||
** | ** Worked on converting 1-component Irikura file to BBP seismograms | ||
** | * Talked to JC | ||
* | ** Provided instructions on how to run on cluster | ||
** Got JC set up on epicenter, ready to go | |||
* Worked with KO and RS to fix SDSU method | |||
** Got fixes for 2 bugs in the SDSU code | |||
** Code still produces different low-frequency seismograms | |||
* ExSIM method | |||
** Received e-mail from KA regarding ExSIM's parameters | |||
** Follow-up with KA and CG to clarify per-event issues | |||
== Today: == | == Today: == | ||
* | * Finish Irikura code, run simulations on epicenter for part A and part B | ||
* | * Waiting for SDSU code update | ||
* Ran last GMPE scenario for CSM method, send results to JA | |||
* | |||
== Blocked: == | == Blocked: == | ||
| Line 33: | Line 34: | ||
== Followups: == | == Followups: == | ||
* | * SEISM call @ 11am | ||
* EXSIM call with CG and KA @ 1pm | |||
Revision as of 17:13, 2 May 2013
Yesterday:
- Created combined bias plot code
- Post-processes realizations and creates a combined bias plot
- Showed results to CG, took suggestions
- Code finished and checked into svn
- CSM Method
- Generated results for all 5 california events for part A
- Created combined plots, ranking file
- Sent results to JA
- Got code update from JA with fix to green's function generator bug
- Update BBP version, patch fixes GF code's bug
- Irikura method
- Got filter details from JB
- Worked on converting 1-component Irikura file to BBP seismograms
- Talked to JC
- Provided instructions on how to run on cluster
- Got JC set up on epicenter, ready to go
- Worked with KO and RS to fix SDSU method
- Got fixes for 2 bugs in the SDSU code
- Code still produces different low-frequency seismograms
- ExSIM method
- Received e-mail from KA regarding ExSIM's parameters
- Follow-up with KA and CG to clarify per-event issues
Today:
- Finish Irikura code, run simulations on epicenter for part A and part B
- Waiting for SDSU code update
- Ran last GMPE scenario for CSM method, send results to JA
Blocked:
- No
Followups:
- SEISM call @ 11am
- EXSIM call with CG and KA @ 1pm