Staff Priorities - Scott: Difference between revisions
From SCECpedia
Jump to navigationJump to search
No edit summary |
No edit summary |
||
| Line 1: | Line 1: | ||
== Yesterday == | == Yesterday == | ||
*Blue Waters: | *Blue Waters: | ||
** | **Monitored production runs | ||
** | **Continue testing and getting performance numbers for revised extraction jobs - found and fixed bug | ||
**Pointed Efecan towards 1 Hz run | |||
*Stampede: | |||
**Continued work on offloading code | |||
*Sent out map with locations of sites with all four permutations from Study 13.4 | |||
*Sent out curve diff | |||
== Today == | == Today == | ||
*Blue Waters: | *Blue Waters: | ||
** | **Continue monitoring production runs | ||
** | **Point Efecan and Liwen towards coscheduling and post-processing | ||
*Stampede: | *Stampede: | ||
**Continue work on offloading code | **Continue work on offloading code | ||
* | *Identify largest-difference curves, send out plots | ||
== Blocked == | == Blocked == | ||
| Line 16: | Line 21: | ||
== Follow-ups == | == Follow-ups == | ||
* | *Phil and David - 12-1 | ||
Revision as of 17:38, 10 May 2013
Yesterday
- Blue Waters:
- Monitored production runs
- Continue testing and getting performance numbers for revised extraction jobs - found and fixed bug
- Pointed Efecan towards 1 Hz run
- Stampede:
- Continued work on offloading code
- Sent out map with locations of sites with all four permutations from Study 13.4
- Sent out curve diff
Today
- Blue Waters:
- Continue monitoring production runs
- Point Efecan and Liwen towards coscheduling and post-processing
- Stampede:
- Continue work on offloading code
- Identify largest-difference curves, send out plots
Blocked
- No
Follow-ups
- Phil and David - 12-1
Finish wiki entries for Stampede and Blue Waters validation
Areas of Responsibilities
- CyberShake 1.4
- Broadband CyberShake
- Code migration