Staff Priorities - Scott: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Scottcal (talk | contribs)
No edit summary
Scottcal (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday ==
== Yesterday ==
*Blue Waters:
*Blue Waters:
**Monitored production runs
**Continue monitoring production runs
**Continue testing and getting performance numbers for revised extraction jobs - found and fixed bug
**Bundled coscheduling/post-processing for Efecan and Liwen
**Pointed Efecan towards 1 Hz run
*Stampede:
*Stampede:
**Continued work on offloading code
**Continue work on offloading code
*Sent out map with locations of sites with all four permutations from Study 13.4
*Sent out plots of largest difference curves
*Sent out curve diff
*Walkthrough with Phil and David


== Today ==
== Today ==
*Blue Waters:
*Blue Waters:
**Continue monitoring production runs
**Continue monitoring production runs
**Point Efecan and Liwen towards coscheduling and post-processing
**Email path to Efecan and Liwen
*Stampede:
*Stampede:
**Continue work on offloading code
**Continue work on offloading code
*Identify largest-difference curves, send out plots
*Running out of room again on scec-02 - propose moving off PSA/Seismogram results to scec-04


== Blocked ==
== Blocked ==
Line 21: Line 20:


== Follow-ups ==  
== Follow-ups ==  
*Phil and David - 12-1
*Readiness review for Broadband production runs - 1p PDT





Revision as of 18:25, 13 May 2013

Yesterday

  • Blue Waters:
    • Continue monitoring production runs
    • Bundled coscheduling/post-processing for Efecan and Liwen
  • Stampede:
    • Continue work on offloading code
  • Sent out plots of largest difference curves
  • Walkthrough with Phil and David

Today

  • Blue Waters:
    • Continue monitoring production runs
    • Email path to Efecan and Liwen
  • Stampede:
    • Continue work on offloading code
  • Running out of room again on scec-02 - propose moving off PSA/Seismogram results to scec-04

Blocked

  • No

Follow-ups

  • Readiness review for Broadband production runs - 1p PDT


Finish wiki entries for Stampede and Blue Waters validation

Areas of Responsibilities

  • CyberShake 1.4
  • Broadband CyberShake
  • Code migration