=== Yesterday ===
=== Yesterday ===


* Sent Tran CSEP status summary since V12.1.0
* TD: new model submission from MIT
** John created TD development image, Ji installed and compiled the codes on the image


* csep-op server:
* csep-op server:
** Reprocessed and posted results for Max (from GFZ, Potsdam) for updated USGS vs. RELM forecasts for 2008-2012, 2006-2011, 2006-2013 testing periods
** Discrepancy in logL results for EEPAS-0S_Combined forecast as reported by Max Schneider
** Data request by David Rhoades (retrospective 10 years of 3-month alarm-based forecasts)
*** Don't see reported -73 vs. -76 values, only 0.1% difference in logL results
 
*** Differences are due to the scale factor for the last test date being 0.989999
* Posted CSEP status meeting minutes


* CSEP Trac tickets:
* CSEP Trac tickets:
** #310 Move the model names from the right-hand-side to the left-hand side of the plot figure for T and W tests
** DONE: #310 Move the model names from the right-hand-side to the left-hand side of the plot figure for T and W tests
** #311 Add support for different evaluation tests schedules within the same forecast group
** #311 Add support for different evaluation tests schedules within the same forecast group
** #312 Add support for 30-minutes forecasts
** #312 Add support for 30-minutes forecasts
Line 19: Line 19:
==== CSEP ====
==== CSEP ====


* TD: new model installation from MIT
* John asked if Matlab R2007a can be retired
** Ask John to create TD development image, and login for the modeler
** TD testing center is using the license, asked John to install latest Matlab within TD image to run acceptance test for Rowena's model


* csep-op server:
csep-op:
** Re-processing to catch up with evaluation during 2 weeks of down time
** Re-processing to catch up with evaluation during 2 weeks of down time
** Data request from Alvaro Gonzalez: to process missed one-day forecasts and latest results


* CSEP Trac tickets:
* CSEP Trac tickets:
** #310 Move the model names from the right-hand-side to the left-hand side of the plot figure for T and W tests
** Working on: #311 Add support for different evaluation tests schedules within the same forecast group
** #311 Add support for different evaluation tests schedules within the same forecast group
** #312 Add support for 30-minutes forecasts
** #312 Add support for 30-minutes forecasts
* Max Schneider:
** Discrepancy in logL computations for EEPAS-0S_Combined with start date of 2010/04/01
* Pending data requests:
** By Alvaro Gonzalez: to process missed one-day forecasts and latest results


=== TODO ===
=== TODO ===
Line 40: Line 34:
'''Blocked''': None
'''Blocked''': None


'''Followups''': None
'''Followups''': with Phil on CSEP, TD, and EEW priorities


== Responsiblities ==
== Responsiblities ==

Revision as of 18:50, 22 May 2013

Current Activities

Yesterday

  • TD: new model submission from MIT
    • John created TD development image, Ji installed and compiled the codes on the image
  • csep-op server:
    • Discrepancy in logL results for EEPAS-0S_Combined forecast as reported by Max Schneider
      • Don't see reported -73 vs. -76 values, only 0.1% difference in logL results
      • Differences are due to the scale factor for the last test date being 0.989999
  • CSEP Trac tickets:
    • DONE: #310 Move the model names from the right-hand-side to the left-hand side of the plot figure for T and W tests
    • #311 Add support for different evaluation tests schedules within the same forecast group
    • #312 Add support for 30-minutes forecasts

Today

CSEP

  • John asked if Matlab R2007a can be retired
    • TD testing center is using the license, asked John to install latest Matlab within TD image to run acceptance test for Rowena's model

csep-op:

    •  Re-processing to catch up with evaluation during 2 weeks of down time
    • Data request from Alvaro Gonzalez: to process missed one-day forecasts and latest results
  • CSEP Trac tickets:
    • Working on: #311 Add support for different evaluation tests schedules within the same forecast group
    • #312 Add support for 30-minutes forecasts

TODO

Blocked: None

Followups: with Phil on CSEP, TD, and EEW priorities