Staff Priorities - Fabio: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Fsilva (talk | contribs)
No edit summary
Fsilva (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday: ==
== Yesterday: ==


* Broadband unit tests
* Table comparing nbns nodes against new nodes posted on wiki
** Scenarios now use Whittier Narrows instead of Loma Prieta
* Wrote cluster script for scenario earthquakes
** Faster to run (about 50% faster)
* Code cleanup
* Updated reference files as required by new versions of the code
* Helped JB with BBP simulations
** All unit tests pass
* Looked into BBP review panel data requests
* Worked on combined table for TH, CG, and BBP Review Panel
* Started wiki page with BBP simulation plans
* Fix issue in map generation code
** Now works when no stations are available for a certain period


== Today: ==
== Today: ==


* Get BBP 13.6.1 set up on the Broadband server for other users (LB, SGS)
* Test scenario earthquake cluster script
* Run BBP on HPCC using other queues (compare node performance)
* Complete simulation plans table with runtime estimates
* Update trac issues
* Finish combining UCSB rupture generators (trac #177)
* Create unit tests for new methods (CSM, ExSIM)
* Fix map plotting issue with new matplotlib version (trac #202)


== Blocked: ==
== Blocked: ==
Line 21: Line 19:


== Followups: ==
== Followups: ==
* BBP Meeting with PM @ TBD
* SEISM Call @ 11am
* BBP Simulation Planning call @ 1pm

Revision as of 16:58, 11 July 2013

Yesterday:

  • Table comparing nbns nodes against new nodes posted on wiki
  • Wrote cluster script for scenario earthquakes
  • Code cleanup
  • Helped JB with BBP simulations
  • Looked into BBP review panel data requests
  • Started wiki page with BBP simulation plans

Today:

  • Test scenario earthquake cluster script
  • Complete simulation plans table with runtime estimates
  • Finish combining UCSB rupture generators (trac #177)
  • Fix map plotting issue with new matplotlib version (trac #202)

Blocked:

  • No

Followups:

  • SEISM Call @ 11am
  • BBP Simulation Planning call @ 1pm