Staff Priorities - Fabio: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Fsilva (talk | contribs)
No edit summary
Fsilva (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday: ==
== Yesterday: ==


* Tested and checked into svn matplotlib fix (trac #202)
* Finished draft for AGU abstract, sent for comments
* Updated several trac tickets
* Ran full NR validation with 133 stations
* BBP Science call
** Got good result
* Skype with CG
* Contacted KW wrt SWUS scenario simulations
* Finished new tables for BBP review panel
** Scheduled follow-up today
** Sent to TH, who produced new Excel tables and sent to panel
* Ran test cases for JB
** Some issues with UCSB code


== Today: ==
== Today: ==


* Generate raw data files for CG for Part A events
* Set up Loma Prieta full validation
* Send e-mail to SGS regarding new BBP version
* Run Loma Prieta full validation for GP
* Continue work on acceptance tests
* Run NR full validation for ExSIM, SDSU, CSM
* Debug old Northridge event
* Finalize AGU abstract after all comments are in
* Continue debugging UCSB code issue from JB


== Blocked: ==
== Blocked: ==
Line 19: Line 21:


== Followups: ==
== Followups: ==
* No
* KW - SWUS scenarios @ 3:00pm

Revision as of 17:27, 6 August 2013

Yesterday:

  • Finished draft for AGU abstract, sent for comments
  • Ran full NR validation with 133 stations
    • Got good result
  • Contacted KW wrt SWUS scenario simulations
    • Scheduled follow-up today
  • Ran test cases for JB
    • Some issues with UCSB code

Today:

  • Set up Loma Prieta full validation
  • Run Loma Prieta full validation for GP
  • Run NR full validation for ExSIM, SDSU, CSM
  • Finalize AGU abstract after all comments are in
  • Continue debugging UCSB code issue from JB

Blocked:

  • No

Followups:

  • KW - SWUS scenarios @ 3:00pm