Staff Priorities - Phil: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Maechlin (talk | contribs)
No edit summary
Maechlin (talk | contribs)
No edit summary
Line 5: Line 5:
* UCVM discussion David
* UCVM discussion David


== Today: ==
== Today: ==
* XSEDE call Peter Powers 10am
* XSEDE call Peter Powers 10am
* Call with JB 11am
* Call with JB 11am

Revision as of 17:54, 29 October 2013

Yesterday:

  • Integrate PetaSHA3 feedback
  • Iteration Planning BBP
  • Contact EH about ShakeAlert Testing
  • UCVM discussion David

Today:

  • XSEDE call Peter Powers 10am
  • Call with JB 11am
  • Meet with Admins 1pm
  • PRAC Information

Blocked:

  • No

Followups:

  • No

Pending:

  • Travel plans to SC and AGU
  • Contact with HPCC for SC plans
  • Finalize SC BOF and Posters
  • Security Discussion with SC
  • Backup strategy with group
  • setup license meeting with Stevens USC
  • Create Storage Map for SCEC Storage (SC)
  • Add AWstats to bbpvault