Staff Priorities - Phil: Difference between revisions
From SCECpedia
Jump to navigationJump to search
No edit summary |
|||
| Line 1: | Line 1: | ||
== Yesterday: == | == Yesterday: == | ||
* | * NCAR Report to TJ YC | ||
* | * Posted SC materials on wiki | ||
* Collected IDC report from SC13 | |||
* Ergo eval | |||
* UCVM Paper review | |||
* OLCF follow-up | |||
== Today: == | == Today: == | ||
* | * Setup High-F call for Wed | ||
* High-F call 11:30am | |||
* YC Call 2pm | |||
* SC to propose BW metrics from paper | |||
* Setup INCITE Startup Request Call | * Setup INCITE Startup Request Call | ||
| Line 15: | Line 21: | ||
== Pending: == | == Pending: == | ||
*THJ and YC Call | * THJ and YC Call | ||
* NGA-E Plan link to THJ | * NGA-E Plan link to THJ | ||
* FW ABF into CME codebase | * FW ABF into CME codebase | ||
Revision as of 18:24, 26 November 2013
Yesterday:
- NCAR Report to TJ YC
- Posted SC materials on wiki
- Collected IDC report from SC13
- Ergo eval
- UCVM Paper review
- OLCF follow-up
Today:
- Setup High-F call for Wed
- High-F call 11:30am
- YC Call 2pm
- SC to propose BW metrics from paper
- Setup INCITE Startup Request Call
Blocked:
- No
Followups:
- No
Pending:
- THJ and YC Call
- NGA-E Plan link to THJ
- FW ABF into CME codebase
- Formalize the simulation plans for NR
- Call with SD and KO on dynamic rupture
- Find images from CMU of circular GTL structures
- Security Discussion with SC
- Backup strategy with group
- Setup license meeting with Stevens USC
- Create Storage Map for SCEC Storage (SC)
- Updated BBP and UCVM required docs to include "known problems" file