Staff Priorities - Phil: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Maechlin (talk | contribs)
No edit summary
Maechlin (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday: ==
== Yesterday: ==
* NCAR Report to TJ  YC
* High-F call 11:30am RT
* Posted SC materials on wiki
* YC Call 2pm
* Collected IDC report from SC13
* �Submitted NCAR report
* Ergo eval
* UCVM Paper review
* OLCF follow-up


== Today: ==
== Today: ==
* Setup High-F call for Wed
* TJ Meeting
* High-F call 11:30am
* SC Travel docs
* YC Call 2pm
* High-F call 10:30-11am
* SC to propose BW metrics from paper
* SC to propose BW metrics from paper
* Setup INCITE Startup Request Call
* Setup INCITE Startup Request Call

Revision as of 17:59, 27 November 2013

Yesterday:

  • High-F call 11:30am RT
  • YC Call 2pm
  • �Submitted NCAR report

Today:

  • TJ Meeting
  • SC Travel docs
  • High-F call 10:30-11am
  • SC to propose BW metrics from paper
  • Setup INCITE Startup Request Call

Blocked:

  • No

Followups:

  • No

Pending:

  • THJ and YC Call
  • NGA-E Plan link to THJ
  • FW ABF into CME codebase
  • Formalize the simulation plans for NR
  • Call with SD and KO on dynamic rupture
  • Find images from CMU of circular GTL structures
  • Security Discussion with SC
  • Backup strategy with group
  • Setup license meeting with Stevens USC
  • Create Storage Map for SCEC Storage (SC)
  • Updated BBP and UCVM required docs to include "known problems" file