Staff Priorities - Phil: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Maechlin (talk | contribs)
No edit summary
Maechlin (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday: ==
== Yesterday: ==
* Review AGU Posters BBP, CSEP, UCVM
* Peace on Earth
* Make AGU Poster EEW


== Today: ==
== Today: ==
* Circulate INCITE Machine User Lists
* DOE 2013 Final Report
* BBP Call (2pm)
* SCEC EarthCube participation
* BBP Storage Review
* Chair Palace
*


== Blocked: ==
== Blocked: ==
Line 12: Line 12:


== Followups: ==  
== Followups: ==  
* UCVM Release planning review
* UCVM meeting ()
* BBP Meeting ()
* CSEP Meeting ()
* CyberShake Meeting ()
* UCERF Meeting ()
* High-F Update


== Pending: ==
== Pending: ==
* THJ and YC Call
* THJ and YC Call
* NGA-E Plan link to THJ
* FW ABF into CME codebase
* FW ABF into CME codebase
* Formalize the simulation plans for NR
* Formalize the simulation plans for NR
* Call with SD and KO on dynamic rupture
* Find images from CMU of circular GTL structures
* Find images from CMU of circular GTL structures
* Security Discussion with SC
* Security Discussion with SC

Revision as of 17:38, 6 January 2014

Yesterday:

  • Peace on Earth

Today:

  • DOE 2013 Final Report
  • SCEC EarthCube participation
  • Chair Palace

Blocked:

  • No

Followups:

  • UCVM meeting ()
  • BBP Meeting ()
  • CSEP Meeting ()
  • CyberShake Meeting ()
  • UCERF Meeting ()
  • High-F Update

Pending:

  • THJ and YC Call
  • FW ABF into CME codebase
  • Formalize the simulation plans for NR
  • Find images from CMU of circular GTL structures
  • Security Discussion with SC
  • Backup strategy with group
  • Setup license meeting with Stevens USC
  • Create Storage Map for SCEC Storage (SC)
  • Updated BBP and UCVM required docs to include "known problems" file