Staff Priorities - Phil: Difference between revisions
From SCECpedia
Jump to navigationJump to search
No edit summary |
No edit summary |
||
| Line 1: | Line 1: | ||
== Yesterday: == | == Yesterday: == | ||
* | * Check on M8 seismograms | ||
* | * UCVM Abstract Review | ||
* DC Practice | * DC Practice | ||
* | * Updated JY profile | ||
* | * Confirm ED/GJ Meeting (Jan 16) | ||
* | * Sent Image to OLCF | ||
* Schedule | * Schedule Po visit (Feb 10) | ||
== Today: == | == Today: == | ||
| Line 14: | Line 13: | ||
* DOE INCITE 2013 Final Report | * DOE INCITE 2013 Final Report | ||
* SCEC social media feedback | * SCEC social media feedback | ||
* BBP Call (2pm) | |||
== Blocked: == | == Blocked: == | ||
Revision as of 18:00, 10 January 2014
Yesterday:
- Check on M8 seismograms
- UCVM Abstract Review
- DC Practice
- Updated JY profile
- Confirm ED/GJ Meeting (Jan 16)
- Sent Image to OLCF
- Schedule Po visit (Feb 10)
Today:
- BBP Pub plan call scheduled (Fri 830am)
- YC storage call (11:30am)
- DOE INCITE 2013 Final Report
- SCEC social media feedback
- BBP Call (2pm)
Blocked:
- No
Followups:
- No
Pending:
- UCVM meeting ()
- CSEP Meeting ()
- UCERF Meeting ()
- FW ABF into CME codebase
- Formalize the simulation plans for NR
- Find images from CMU of circular GTL structures
- Security Discussion with SC
- Backup strategy with group
- Setup license meeting with Stevens USC
- Create Storage Map for SCEC Storage (SC)
- Updated BBP and UCVM required docs to include "known problems" file