Staff Priorities - Phil: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Maechlin (talk | contribs)
No edit summary
Maechlin (talk | contribs)
No edit summary
Line 2: Line 2:
* ALCF call
* ALCF call
* Blue Waters Call
* Blue Waters Call
* Proposal reviews
* Work on access to Mira
*  
* Proposal reviews (Due Jan 15)
* Telecon list to Tom/Tran
* DC Meeting
* DC Seminar
* ShakeOut movies for GB
* Ask EL and SS to reactive Mira accts
* HK 1D questions with TJ,KO,RG,EH
* Update BW docs
* Schedule Web Dev Meeting (Tuesday 1pm)
* Schedule


== Today: ==
== Today: ==
* BBP Pub plan call scheduled (Fri 830am)
* Check on BBP Storage Status
* YC storage call (11:30am)
* Submit proposal reviews
* Proposal Planning (11:30-1pm)
* DOE INCITE 2013 Final Report
* DOE INCITE 2013 Final Report
* SCEC social media feedback
* SCEC social media feedback
* BBP Call (2pm)


== Blocked: ==
== Blocked: ==
Line 19: Line 28:


== Pending: ==
== Pending: ==
* UCVM meeting ()
* CSEP Meeting ()
* UCERF Meeting ()
* FW ABF into CME codebase
* FW ABF into CME codebase
* Formalize the simulation plans for NR
* Formalize the simulation plans for NR

Revision as of 17:44, 16 January 2014

Yesterday:

  • ALCF call
  • Blue Waters Call
  • Work on access to Mira
  • Proposal reviews (Due Jan 15)
  • Telecon list to Tom/Tran
  • DC Meeting
  • DC Seminar
  • ShakeOut movies for GB
  • Ask EL and SS to reactive Mira accts
  • HK 1D questions with TJ,KO,RG,EH
  • Update BW docs
  • Schedule Web Dev Meeting (Tuesday 1pm)
  • Schedule

Today:

  • Check on BBP Storage Status
  • Submit proposal reviews
  • Proposal Planning (11:30-1pm)
  • DOE INCITE 2013 Final Report
  • SCEC social media feedback

Blocked:

  • No

Followups:

  • No

Pending:

  • FW ABF into CME codebase
  • Formalize the simulation plans for NR
  • Find images from CMU of circular GTL structures
  • Security Discussion with SC
  • Backup strategy with group
  • Setup license meeting with Stevens USC
  • Create Storage Map for SCEC Storage (SC)
  • Updated BBP and UCVM required docs to include "known problems" file