Staff Priorities - Scott: Difference between revisions
From SCECpedia
Jump to navigationJump to search
No edit summary |
No edit summary |
||
| Line 1: | Line 1: | ||
== Yesterday == | == Yesterday == | ||
* | *Refactored and tested vmesh gen code | ||
* | *Compared runtimes of GPU code with different size meshes - slower, more efficient on multiple-of-200 mesh | ||
* | *Queued CVM-H no GTL with 4 sites | ||
* | *Tried installing UCVM w/BBP 1D, tests failed | ||
* | *Tested performance of more CPUs for AWP - 50x50x50 is faster and more efficient | ||
*Updated algorithm for synth runtimes | |||
*Changed bookkeeping so that UCVM 1D model is tracked as "SCEC 1D", not HK | |||
*Added BBP 1D to workflow and scripts | |||
== Today == | == Today == | ||
*Try 7x PP test on BW | *Try 7x PP test on BW | ||
* | *Check on curves with CVM-H, no GTL | ||
*Queue hazard curves with GPU, CPU code and CVM-S4.26 | *Queue hazard curves with GPU, CPU code and CVM-S4.26 | ||
*Continue preparing readiness review | *Continue preparing readiness review | ||
* | *Generate BBP 1D curves | ||
== Blocked == | == Blocked == | ||
| Line 21: | Line 20: | ||
== Follow-ups == | == Follow-ups == | ||
* | *Summer School call | ||
*High F call | |||
*CyberShake calls | |||
== Areas of Responsibilities == | == Areas of Responsibilities == | ||
Revision as of 18:08, 28 January 2014
Yesterday
- Refactored and tested vmesh gen code
- Compared runtimes of GPU code with different size meshes - slower, more efficient on multiple-of-200 mesh
- Queued CVM-H no GTL with 4 sites
- Tried installing UCVM w/BBP 1D, tests failed
- Tested performance of more CPUs for AWP - 50x50x50 is faster and more efficient
- Updated algorithm for synth runtimes
- Changed bookkeeping so that UCVM 1D model is tracked as "SCEC 1D", not HK
- Added BBP 1D to workflow and scripts
Today
- Try 7x PP test on BW
- Check on curves with CVM-H, no GTL
- Queue hazard curves with GPU, CPU code and CVM-S4.26
- Continue preparing readiness review
- Generate BBP 1D curves
Blocked
- No
Follow-ups
- Summer School call
- High F call
- CyberShake calls
Areas of Responsibilities
- CyberShake
- Broadband CyberShake
- Code migration