Staff Priorities - Phil: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Maechlin (talk | contribs)
No edit summary
Maechlin (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday: ==
== Yesterday: ==
* High-F Call (11am)
* Contact SRL editor
* CyberShake Call (11:30am)
* Contact ED about EC project
* Web Meeting (1pm)
* Work with DG on 1D model for CyberShake
* BBP Call (2pm)
* Check with KO RG on Moho
* Check on BBP Storage Status
* Talk with EL


== Today: ==
== Today: ==
* Work with DG on 1D model for CyberShake
* PC feedback
* DOE INCITE 2013 Final Report
* DOE INCITE 2013 Final Report
* SCEC social media feedback
* Send out Geo Call Announce
* Check on BBP Storage Status
* Contact SRL
* Confirm SI2 meeting
* Confirm SI2 meeting


Line 17: Line 17:


== Followups: ==
== Followups: ==
* No
*  


== Pending: ==
== Pending: ==

Revision as of 17:50, 30 January 2014

Yesterday:

  • Contact SRL editor
  • Contact ED about EC project
  • Work with DG on 1D model for CyberShake
  • Check with KO RG on Moho
  • Check on BBP Storage Status
  • Talk with EL

Today:

  • PC feedback
  • DOE INCITE 2013 Final Report
  • Send out Geo Call Announce
  • Confirm SI2 meeting

Blocked:

  • No

Followups:

Pending:

  • FW ABF into CME codebase
  • Formalize the simulation plans for NR
  • Find images from CMU of circular GTL structures
  • Security Discussion with SC
  • Backup strategy with group
  • Setup license meeting with Stevens USC
  • Create Storage Map for SCEC Storage (SC)
  • Updated BBP and UCVM required docs to include "known problems" file