Staff Priorities - Phil: Difference between revisions
From SCECpedia
Jump to navigationJump to search
No edit summary |
No edit summary |
||
| Line 1: | Line 1: | ||
== Yesterday: == | == Yesterday: == | ||
* | * Contact SRL editor | ||
* CyberShake | * Contact ED about EC project | ||
* | * Work with DG on 1D model for CyberShake | ||
* BBP | * Check with KO RG on Moho | ||
* Check on BBP Storage Status | |||
* Talk with EL | |||
== Today: == | == Today: == | ||
* | * PC feedback | ||
* DOE INCITE 2013 Final Report | * DOE INCITE 2013 Final Report | ||
* | * Send out Geo Call Announce | ||
* Confirm SI2 meeting | * Confirm SI2 meeting | ||
| Line 17: | Line 17: | ||
== Followups: == | == Followups: == | ||
* | * | ||
== Pending: == | == Pending: == | ||
Revision as of 17:50, 30 January 2014
Yesterday:
- Contact SRL editor
- Contact ED about EC project
- Work with DG on 1D model for CyberShake
- Check with KO RG on Moho
- Check on BBP Storage Status
- Talk with EL
Today:
- PC feedback
- DOE INCITE 2013 Final Report
- Send out Geo Call Announce
- Confirm SI2 meeting
Blocked:
- No
Followups:
Pending:
- FW ABF into CME codebase
- Formalize the simulation plans for NR
- Find images from CMU of circular GTL structures
- Security Discussion with SC
- Backup strategy with group
- Setup license meeting with Stevens USC
- Create Storage Map for SCEC Storage (SC)
- Updated BBP and UCVM required docs to include "known problems" file