Staff Priorities - Phil: Difference between revisions
From SCECpedia
Jump to navigationJump to search
No edit summary |
No edit summary |
||
| Line 1: | Line 1: | ||
== Yesterday: == | == Yesterday: == | ||
* | * DOE INCITE 2013 Final Report w/ GE | ||
* | * DOE INCITE 2013 Final Report w/ PC | ||
* | * BBP 1D model follow-up with DG | ||
* | * Coordinate EC Call with ED | ||
* | * Review SRR from SC | ||
* | ** Requests: add CVM-H GTL Maps w/ test stations | ||
** Requests: add 1D plots w/ 1km transition to Moho | |||
== Today: == | == Today: == | ||
* Review TRR | |||
* Review TRR from SC | |||
* EC Call with ED | |||
* Update EC prospectus | |||
* PC feedback | * PC feedback | ||
* Send out Geo/SI2 Call Announce | * Send out Geo/SI2 Call Announce | ||
* TTI one | * TTI one pager | ||
== Blocked: == | == Blocked: == | ||
| Line 17: | Line 21: | ||
== Followups: == | == Followups: == | ||
* | * Nvidia meeting at 1:30pm | ||
== Pending: == | == Pending: == | ||
Revision as of 17:45, 31 January 2014
Yesterday:
- DOE INCITE 2013 Final Report w/ GE
- DOE INCITE 2013 Final Report w/ PC
- BBP 1D model follow-up with DG
- Coordinate EC Call with ED
- Review SRR from SC
- Requests: add CVM-H GTL Maps w/ test stations
- Requests: add 1D plots w/ 1km transition to Moho
Today:
- Review TRR
- Review TRR from SC
- EC Call with ED
- Update EC prospectus
- PC feedback
- Send out Geo/SI2 Call Announce
- TTI one pager
Blocked:
- No
Followups:
- Nvidia meeting at 1:30pm
Pending:
- Confirm SI2 meeting
- CS parallelism discussion with SC
- FW ABF into CME codebase
- Formalize the simulation plans for NR
- Find images from CMU of circular GTL structures
- Security Discussion with SC
- Backup strategy with group
- Setup license meeting with Stevens USC
- Create Storage Map for SCEC Storage (SC)
- Updated BBP and UCVM required docs to include "known problems" file