Staff Priorities - Phil: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Maechlin (talk | contribs)
No edit summary
Maechlin (talk | contribs)
No edit summary
Line 2: Line 2:
* DOE INCITE 2013 Final Report w/ GE
* DOE INCITE 2013 Final Report w/ GE
* DOE INCITE 2013 Final Report w/ PC
* DOE INCITE 2013 Final Report w/ PC
* INCITE ESP Project clean-up w/ PC, EL, GE, YC
* BBP 1D model follow-up with DG
* BBP 1D model follow-up with DG
* Coordinate EC Call with ED
* Coordinate EC Call with ED
* GTL archives for JS
* Review SRR from SC
* Review SRR from SC
* BW storage request w/ SC
** Requests: add CVM-H GTL Maps w/ test stations
** Requests: add CVM-H GTL Maps w/ test stations
** Requests: add 1D  plots w/ 1km transition to Moho
** Requests: add 1D  plots w/ 1km transition to Moho
* EC Call with ED


== Today: ==
== Today: ==
* PC feedback
* Send out Geo/SI2 Call Announce
* Review TRR
* Review TRR
* Review TRR from SC
* Review TRR from SC
* EC Call with ED
* Update EC prospectus
* Update EC prospectus
* PC feedback
* Send out Geo/SI2 Call Announce
* TTI one pager
* TTI one pager



Revision as of 17:55, 31 January 2014

Yesterday:

  • DOE INCITE 2013 Final Report w/ GE
  • DOE INCITE 2013 Final Report w/ PC
  • INCITE ESP Project clean-up w/ PC, EL, GE, YC
  • BBP 1D model follow-up with DG
  • Coordinate EC Call with ED
  • GTL archives for JS
  • Review SRR from SC
  • BW storage request w/ SC
    • Requests: add CVM-H GTL Maps w/ test stations
    • Requests: add 1D plots w/ 1km transition to Moho
  • EC Call with ED

Today:

  • PC feedback
  • Send out Geo/SI2 Call Announce
  • Review TRR
  • Review TRR from SC
  • Update EC prospectus
  • TTI one pager

Blocked:

  • No

Followups:

  • Nvidia meeting at 1:30pm

Pending:

  • Confirm SI2 meeting
  • CS parallelism discussion with SC
  • FW ABF into CME codebase
  • Formalize the simulation plans for NR
  • Find images from CMU of circular GTL structures
  • Security Discussion with SC
  • Backup strategy with group
  • Setup license meeting with Stevens USC
  • Create Storage Map for SCEC Storage (SC)
  • Updated BBP and UCVM required docs to include "known problems" file