Staff Priorities - Phil: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Maechlin (talk | contribs)
No edit summary
Maechlin (talk | contribs)
No edit summary
Line 11: Line 11:
* INCITE 2013 Final Report Draft
* INCITE 2013 Final Report Draft
* Send out Geo Call Announce
* Send out Geo Call Announce
* Staff Meeting (2pm)


== Blocked: ==
== Blocked: ==

Revision as of 18:16, 3 February 2014

Yesterday:

  • PC feedback
  • Send out Geo Call Announce
  • EC Discussion with TJ/ED
  • Nvidia meeting at 1:30pm

Today:

  • Schedule CS Science Review
  • EC Draft Update
  • TTI one pager
  • INCITE 2013 Final Report Draft
  • Send out Geo Call Announce
  • Staff Meeting (2pm)

Blocked:

  • No

Followups:

  • BBP Med-term discussion
  • Blue Waters Scheduled downtime

Pending:

  • Confirm SI2 meeting
  • CS parallelism discussion with SC
  • FW ABF into CME codebase
  • Formalize the simulation plans for NR
  • Find images from CMU of circular GTL structures
  • Security Discussion with SC
  • Backup strategy with group
  • Setup license meeting with Stevens USC
  • Create Storage Map for SCEC Storage (SC)
  • Updated BBP and UCVM required docs to include "known problems" file