Staff Priorities - Phil: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Maechlin (talk | contribs)
No edit summary
Maechlin (talk | contribs)
No edit summary
Line 13: Line 13:
* CyberShake paper review
* CyberShake paper review
* PC Final Reviews
* PC Final Reviews
* Blue Waters Metrics one-pager
* INCITE Final Report Draft out
* INCITE Final Report Draft out
* Blue Waters Metrics one-pager


== Blocked: ==
== Blocked: ==
Line 23: Line 23:


== Pending: ==
== Pending: ==
* Confirm SI2 meeting
* CS parallelism discussion with SC
* FW ABF into CME codebase
* FW ABF into CME codebase
* Formalize the simulation plans for NR
* Formalize the simulation plans for NR

Revision as of 17:55, 7 February 2014

Yesterday:

  • Geoinformatics call
  • Coordinate IRIS data meeting at SCEC
  • Setup SI2 travel
  • Call with SRL Ed

Today:

  • UCVM Meeting 11am
  • GMSV Meeting 1115 am
  • BBP Call 2pm
  • Send out SEISM Call Announcement
  • Send SRL Ed paper summary
  • CyberShake paper review
  • PC Final Reviews
  • Blue Waters Metrics one-pager
  • INCITE Final Report Draft out

Blocked:

  • No

Followups:

  • BBP Med-term discussion

Pending:

  • FW ABF into CME codebase
  • Formalize the simulation plans for NR
  • Find images from CMU of circular GTL structures
  • Security Discussion with SC
  • Backup strategy with group
  • Setup license meeting with Stevens USC
  • Create Storage Map for SCEC Storage (SC)
  • Updated BBP and UCVM required docs to include "known problems" file