Staff Priorities - Phil: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Maechlin (talk | contribs)
No edit summary
Maechlin (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday: ==
== Yesterday: ==
* Seism call
* SI2 meeting
* Po meeting
* CyberShake paper review


== Today: ==
== Today: ==
* BBP Call 2pm
* PRAC Call - 11am
* CyberShake paper review
* Mira Call - 2pm
* INCITE Final Report Draft out


== Blocked: ==
== Blocked: ==
Line 13: Line 10:


== Followups: ==
== Followups: ==
* BBP Med-term discussion
* No


== Pending: ==
== Pending: ==
* FW ABF into CME codebase
* FW ABF into CME codebase
* Formalize the simulation plans for NR
* Find images from CMU of circular GTL structures
* Find images from CMU of circular GTL structures
* Security Discussion with SC
* Security Discussion with SC

Revision as of 18:08, 27 February 2014

Yesterday:

  • SI2 meeting

Today:

  • PRAC Call - 11am
  • Mira Call - 2pm

Blocked:

  • No

Followups:

  • No

Pending:

  • FW ABF into CME codebase
  • Find images from CMU of circular GTL structures
  • Security Discussion with SC
  • Backup strategy with group
  • Setup license meeting with Stevens USC
  • Create Storage Map for SCEC Storage (SC)
  • Updated BBP and UCVM required docs to include "known problems" file