Staff Priorities - Scott: Difference between revisions
From SCECpedia
Jump to navigationJump to search
No edit summary |
No edit summary |
||
| Line 1: | Line 1: | ||
== Yesterday == | == Yesterday == | ||
* | *Kevin generated hazard maps for GPU results, posted on wiki, emailed to group | ||
* | *Checked genslip-v3.3.1 against Rob's results, they match | ||
* | *BW allocation planning meeting | ||
*Check-in with Phil | |||
== Today == | == Today == | ||
* | *Continue monitoring Study 14.2 | ||
*Continue integrating genslip v3.3.1 into rupture generator API and test | |||
*Continue | *Try to delete Intrepid data | ||
== Blocked == | == Blocked == | ||
| Line 13: | Line 14: | ||
== Follow-ups == | == Follow-ups == | ||
* | *No | ||
== Areas of Responsibilities == | == Areas of Responsibilities == | ||
Revision as of 18:11, 28 February 2014
Yesterday
- Kevin generated hazard maps for GPU results, posted on wiki, emailed to group
- Checked genslip-v3.3.1 against Rob's results, they match
- BW allocation planning meeting
- Check-in with Phil
Today
- Continue monitoring Study 14.2
- Continue integrating genslip v3.3.1 into rupture generator API and test
- Try to delete Intrepid data
Blocked
- No
Follow-ups
- No
Areas of Responsibilities
- CyberShake
- Broadband CyberShake
- Code migration