Staff Priorities - Phil: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Maechlin (talk | contribs)
Maechlin (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday: ==
== Yesterday: ==
* BW Talk with SC
* BBP Call
* PRAC Call with group
* PRAC Summary Info
* Mira Call with on Storage
* YC Call on SI2 meeting and PRAC
* Contact NSF about PRAC
* Intrepid Storage note
* Initial Review of CS Maps


== Today: ==
== Today: ==
* Mira Storage request
* PRAC Proposal Call 2pm
* Interpolated 1D map request
* PRAC
* PRAC Exec Summary


== Blocked: ==
== Blocked: ==
Line 17: Line 11:


== Followups: ==
== Followups: ==
* No
* BBP Changes w/ FS


== Pending: ==
== Pending: ==

Revision as of 18:01, 3 March 2014

Yesterday:

  • BBP Call
  • PRAC Summary Info

Today:

  • PRAC Proposal Call 2pm
  • PRAC

Blocked:

  • No

Followups:

  • BBP Changes w/ FS

Pending:

  • FW ABF into CME codebase
  • Find images from CMU of circular GTL structures
  • Security Discussion with SC
  • Backup strategy with group
  • Setup license meeting with Stevens USC
  • Create Storage Map for SCEC Storage (SC)
  • Updated BBP and UCVM required docs to include "known problems" file