Staff Priorities - Phil: Difference between revisions

From SCECpedia
Jump to navigationJump to search
Maechlin (talk | contribs)
Maechlin (talk | contribs)
No edit summary
Line 1: Line 1:
== Yesterday: ==
== Yesterday: ==
* BBP Call
* CSEP Call
* PRAC Summary Info
* PRAC Call
* PRAC Draft


== Today: ==
== Today: ==
* PRAC Proposal Call 2pm
* Web call 1030
* Proposal outline
* PRAC Proposal Call 11pm
* CyberShake 1130am


== Blocked: ==
== Blocked: ==
Line 11: Line 13:


== Followups: ==
== Followups: ==
* BBP Changes w/ FS
* Scott now
* CSEP Data Storage w/ ML


== Pending: ==
== Pending: ==

Revision as of 18:31, 4 March 2014

Yesterday:

  • CSEP Call
  • PRAC Call
  • PRAC Draft

Today:

  • Web call 1030
  • PRAC Proposal Call 11pm
  • CyberShake 1130am

Blocked:

  • No

Followups:

  • Scott now

Pending:

  • FW ABF into CME codebase
  • Find images from CMU of circular GTL structures
  • Security Discussion with SC
  • Backup strategy with group
  • Setup license meeting with Stevens USC
  • Create Storage Map for SCEC Storage (SC)
  • Updated BBP and UCVM required docs to include "known problems" file