Staff Priorities - Phil: Difference between revisions
From SCECpedia
Jump to navigationJump to search
No edit summary |
No edit summary |
||
| Line 1: | Line 1: | ||
== Yesterday: == | == Yesterday: == | ||
* | * BBP Call | ||
* | * UCVM Code Review | ||
* Mira Access | |||
* | |||
== Today: == | == Today: == | ||
* | * Call with CG (1030am) | ||
* Call with RP (3pm) | |||
* Arrange Travel to XAB | * Arrange Travel to XAB | ||
* Travel to BW | * Travel to BW | ||
== Blocked: == | == Blocked: == | ||
| Line 24: | Line 18: | ||
== Pending: == | == Pending: == | ||
* Create Storage Map for SCEC Storage (SC) | * Create Storage Map for SCEC Storage (SC) | ||
* Slides for THJ CISE meeting | * Slides for THJ CISE meeting | ||
Revision as of 23:19, 21 March 2014
Yesterday:
- BBP Call
- UCVM Code Review
- Mira Access
Today:
- Call with CG (1030am)
- Call with RP (3pm)
- Arrange Travel to XAB
- Travel to BW
Blocked:
- No
Followups:
- CSEP Storage Purchase
- Paper Planning
Pending:
- Create Storage Map for SCEC Storage (SC)
- Slides for THJ CISE meeting
- Tech Paper Development
- XTREME scaling
- XSEDE Atlanta
- BBP
- Setup license meeting with Stevens USC
- FW ABF into CME codebase
- Find images from CMU of circular GTL structures
- Security Discussion with SC
- Backup strategy with group
- Updated BBP and UCVM required docs to include "known problems" file