Difference between revisions of "Staff Priorities - Phil"

From SCECpedia
Jump to navigationJump to search
Line 8: Line 8:
  
 
== Today: ==
 
== Today: ==
 +
* Deliver storage plan to JY by 12pm
 
* Post laptop storage table on wiki
 
* Post laptop storage table on wiki
 
* Schedule BBP code review
 
* Schedule BBP code review

Revision as of 16:56, 11 April 2014

Yesterday:

  • SEISM Call (11am)
  • HPCC Storage map on wiki
  • Review partitioning of new storage
  • Contact BW on uofm student access
  • Collected laptop backup information from group
  • Collected XSEDE Allocation estimates

Today:

  • Deliver storage plan to JY by 12pm
  • Post laptop storage table on wiki
  • Schedule BBP code review
  • BBP Call (2pm)
  • Test seism email list
  • Fix issues with Geo email list
  • Setup TJ/JT coordination call
  • XSEDE allocation development

Blocked:

  • No

Followups:

  • No

Pending:

  • Develop BBP paper outline
  • GMPE New relations integrated into BBP
  • FW ABF into CME codebase
  • Setup license meeting with Stevens USC
  • Updated BBP and UCVM required docs to include "known problems" file