Difference between revisions of "Staff Priorities - Scott"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday ==
 
== Yesterday ==
*Reviewed BW extended abstract
+
*Sent out NGA-2 plots - wants color changes
*Produced plots for UGMS sites using NGA-2 relationships
+
*Queued up TEST site with large memory version of SeisPSA - errors
*Produced and posted slip and hypo plots for UGMS meeting
+
*Tested broadband install
*Monitored TEST curve with uniform hypos - similar but not matching results to random hypos
 
  
 
== Today ==
 
== Today ==
*Send out NGA-2 plots
+
*Change colors for NGA-2 plots for Tom
 +
*Edit/create slides for Tom's presentation
 +
*Debug errors with TEST site, large memory version of SeisPSA
 
*Run random and uniform tests with USC, PAS, SBSM, WNGC
 
*Run random and uniform tests with USC, PAS, SBSM, WNGC
*Test broadband install
 
 
*Send Efecan sample coscheduling scripts for testing on Titan
 
*Send Efecan sample coscheduling scripts for testing on Titan
 
*Get timing data with rupture variation generator to Yifeng
 
*Get timing data with rupture variation generator to Yifeng

Revision as of 17:11, 9 May 2014

Yesterday

  • Sent out NGA-2 plots - wants color changes
  • Queued up TEST site with large memory version of SeisPSA - errors
  • Tested broadband install

Today

  • Change colors for NGA-2 plots for Tom
  • Edit/create slides for Tom's presentation
  • Debug errors with TEST site, large memory version of SeisPSA
  • Run random and uniform tests with USC, PAS, SBSM, WNGC
  • Send Efecan sample coscheduling scripts for testing on Titan
  • Get timing data with rupture variation generator to Yifeng
  • Run test to see if locality matters

Blocked

  • No

Follow-ups

  • No


  • Try out SeedMe so I can respond to Amit


Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration