Difference between revisions of "Staff Priorities - Phil"
From SCECpedia
Jump to navigationJump to search| Line 1: | Line 1: | ||
== Yesterday: == | == Yesterday: == | ||
| − | * THJ | + | * THJ Call |
| − | * | + | * USR Paper review to JS |
| − | + | * BBP Paper work | |
| − | * BBP | + | * SCEC Status with TH |
| − | * | + | * DOE email response |
| − | * | ||
== Today: == | == Today: == | ||
| − | |||
| − | |||
* BBP Paper | * BBP Paper | ||
| + | * Schedule Proposal Call | ||
| + | * Schedule RG call on NCEE meeting | ||
| + | * TJ and YC prospectus review | ||
== Blocked: == | == Blocked: == | ||
| Line 25: | Line 25: | ||
* GMPE New relations integrated into BBP | * GMPE New relations integrated into BBP | ||
* FW ABF into CME codebase | * FW ABF into CME codebase | ||
| − | |||
* Updated BBP and UCVM required docs to include "known problems" file | * Updated BBP and UCVM required docs to include "known problems" file | ||
Revision as of 16:54, 11 June 2014
Contents
Yesterday:
- THJ Call
- USR Paper review to JS
- BBP Paper work
- SCEC Status with TH
- DOE email response
Today:
- BBP Paper
- Schedule Proposal Call
- Schedule RG call on NCEE meeting
- TJ and YC prospectus review
Blocked:
- No
Followups:
- No
Pending:
- SResponse
- Post laptop storage table on wiki
- Test seism email list
- Fix issues with Geo email list
- GMPE New relations integrated into BBP
- FW ABF into CME codebase
- Updated BBP and UCVM required docs to include "known problems" file