Difference between revisions of "Staff Priorities - Scott"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday ==
 
== Yesterday ==
*Queued USC with random - GPU code failing, must investigate
+
*Debugging workflows on Stampede
*Investigated slow PreSGT - slow reading of files
+
*Upgraded Stampede UCVM install; some issues
*Sent Efecan sample coscheduling scripts for testing on Titan
 
*Discussed Palmdale hotspot with Kevin
 
  
 
== Today ==
 
== Today ==
*Check on USC random GPU failures
+
*Debug issues with Stampede UCVM install
*Speed up PreSGT for 200 m surfaces
+
*Submit USC curve with random hypocenter locations
*Work on Summer School science talk
+
*Queue up 1 Hz input files for Efecan
*Get timing data with rupture variation generator to Yifeng
 
*Run test to see if locality matters
 
  
 
== Blocked ==
 
== Blocked ==

Revision as of 17:23, 13 June 2014

Yesterday

  • Debugging workflows on Stampede
  • Upgraded Stampede UCVM install; some issues

Today

  • Debug issues with Stampede UCVM install
  • Submit USC curve with random hypocenter locations
  • Queue up 1 Hz input files for Efecan

Blocked

  • No

Follow-ups

  • No


  • Try out SeedMe so I can respond to Amit


Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration