Difference between revisions of "Staff Priorities - Fabio"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday ==
 
== Yesterday ==
  
−
* GMPE code revision
+
* Merged latest version of PyNGA into the BBP
−
** Sent updated source files to CG for checking various coefficients
+
** NGA-West 2 GMPEs
−
** Still need test case from CG
+
* Contacted CG regarding A0811EPRI validation
−
* Posted UCSB results for Ralph and Jorge
+
** Will do when back from vacation
−
* LF seismograms code modifications
+
* Finalized scenario simulations with JB
−
** Prompt user for location of LF seismograms
+
** Ready to run
−
** Have Match module peek into LF bbp files to figure out LF DT
+
* BBP call
−
** Updated track tickets
+
* Generated 50 Realizations of Chino Hills and Northridge
−
** Looked at files generated by DG
+
* SCEC AM hotel reservation
−
* Received reply RG wrt velocity models in BBP
 
  
 
== Today ==
 
== Today ==
  
−
* LF Seismogram update
+
* Run first 20 simulation scenarios for JB
−
** Complete code modifications
+
** Send results, wait for go-ahead
−
** Update test cases
+
* Work on AGU abstract
−
** Test Hercules LF seismograms on BBP
+
** Submit to "Seismology Contributions: Earthquake Ground Motions and Engineering Seismology" session
−
* GMPE update
+
* Continue GMPE integration into BBP (NGA-W1, NGA-W2, CENA1 packaging)
−
** Glue code for CENA1 and NGAW1 packages
 
−
** Update GMPE Comparison script
 
−
** Update Part-C scripts
 
  
 
== Blocked: ==
 
== Blocked: ==

Revision as of 17:10, 4 August 2014

Yesterday

  • Merged latest version of PyNGA into the BBP
    • NGA-West 2 GMPEs
  • Contacted CG regarding A0811EPRI validation
    • Will do when back from vacation
  • Finalized scenario simulations with JB
    • Ready to run
  • BBP call
  • Generated 50 Realizations of Chino Hills and Northridge
  • SCEC AM hotel reservation

Today

  • Run first 20 simulation scenarios for JB
    • Send results, wait for go-ahead
  • Work on AGU abstract
    • Submit to "Seismology Contributions: Earthquake Ground Motions and Engineering Seismology" session
  • Continue GMPE integration into BBP (NGA-W1, NGA-W2, CENA1 packaging)

Blocked:

  • No

Followups:

  • No