Difference between revisions of "Staff Priorities - Phil"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday: ==
 
== Yesterday: ==
* UCVM Meeting DG (11am)
+
* Web Telecon
* BBP Call (2pm)
+
* XAB Telecon
 +
* CSEP Telecon
 +
* Call with YC
 +
* SC,FS,DG,ML AGU abstracts
 +
* Virtual Box install of UCVM
  
 
== Today: ==
 
== Today: ==
* Vises Telecon (10:30am)
+
* CAAR Note to TJ
* Web Site Planning (11:30am)
+
* XAB comments
* CAAR Call YC (1:30pm)
+
* JB HPC article
* CME Meeting Agenda to TH
+
* Virtual Box Install
 +
* MAMP install
 +
* Web Dev environment
  
 
== Blocked: ==
 
== Blocked: ==
Line 13: Line 19:
  
 
== Followups: ==
 
== Followups: ==
* Web Site Meeting JY
+
* No
  
 
== Pending: ==
 
== Pending: ==

Revision as of 16:52, 6 August 2014

Yesterday:

  • Web Telecon
  • XAB Telecon
  • CSEP Telecon
  • Call with YC
  • SC,FS,DG,ML AGU abstracts
  • Virtual Box install of UCVM

Today:

  • CAAR Note to TJ
  • XAB comments
  • JB HPC article
  • Virtual Box Install
  • MAMP install
  • Web Dev environment

Blocked:

  • No

Followups:

  • No

Pending:

  • Check on Kraken data storage status
  • Test seism email list
  • Fix issues with Geo email list
  • Geoinformatics report (Aug 15)
  • PRAC Final Report (Nov 15)
  • SResponse
  • FW ABF into CME codebase
  • Updated BBP and UCVM required docs to include "known problems" file