Difference between revisions of "Staff Priorities - Phil"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday: ==
 
== Yesterday: ==
* Web Telecon
+
* CAAR Note to TJ
* XAB Telecon
+
* Virtual Box Install
* CSEP Telecon
+
* MAMP install
* Call with YC
+
* Drupal Dev environment
* SC,FS,DG,ML AGU abstracts
+
* ERI Workshop status sent out
* Virtual Box install of UCVM
+
* CME/GMSV Agenda Updated and sent out
  
 
== Today: ==
 
== Today: ==
* CAAR Note to TJ
 
 
* XAB comments
 
* XAB comments
 
* JB HPC article
 
* JB HPC article
* Virtual Box Install
 
* MAMP install
 
* Web Dev environment
 
  
 
== Blocked: ==
 
== Blocked: ==

Revision as of 16:27, 8 August 2014

Yesterday:

  • CAAR Note to TJ
  • Virtual Box Install
  • MAMP install
  • Drupal Dev environment
  • ERI Workshop status sent out
  • CME/GMSV Agenda Updated and sent out

Today:

  • XAB comments
  • JB HPC article

Blocked:

  • No

Followups:

  • No

Pending:

  • Check on Kraken data storage status
  • Test seism email list
  • Fix issues with Geo email list
  • Geoinformatics report (Aug 15)
  • PRAC Final Report (Nov 15)
  • SResponse
  • FW ABF into CME codebase
  • Updated BBP and UCVM required docs to include "known problems" file