Difference between revisions of "Staff Priorities - Fabio"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday ==
 
== Yesterday ==
  
* Merged latest version of PyNGA into the BBP
+
* Finished packaging NGAE study on HPCC
** NGA-West 2 GMPEs
+
* Transfered data to USB drive
* Contacted CG regarding A0811EPRI validation
+
* Created study page
** Will do when back from vacation
+
* Worked on GMPE GoF code
* Finalized scenario simulations with JB
+
** almost complete
** Ready to run
+
* Ran Mineral event using UCSB's new GFs
* BBP call
+
** Sent comparison plots to JC
* Generated 50 Realizations of Chino Hills and Northridge
 
* SCEC AM hotel reservation
 
  
 
== Today ==
 
== Today ==
  
* Run first 20 simulation scenarios for JB
+
* Finish GMPE code modifications
** Send results, wait for go-ahead
+
* Test BBP code
* Work on AGU abstract
+
* BBP call
** Submit to "Seismology Contributions: Earthquake Ground Motions and Engineering Seismology" session
+
* Get summer school laptop back from JY
* Continue GMPE integration into BBP (NGA-W1, NGA-W2, CENA1 packaging)
 
  
 
== Blocked: ==
 
== Blocked: ==
Line 23: Line 20:
  
 
== Followups: ==
 
== Followups: ==
* No
+
* BBP Call at 2pm

Revision as of 17:08, 22 August 2014

Yesterday

  • Finished packaging NGAE study on HPCC
  • Transfered data to USB drive
  • Created study page
  • Worked on GMPE GoF code
    • almost complete
  • Ran Mineral event using UCSB's new GFs
    • Sent comparison plots to JC

Today

  • Finish GMPE code modifications
  • Test BBP code
  • BBP call
  • Get summer school laptop back from JY

Blocked:

  • No

Followups:

  • BBP Call at 2pm