Difference between revisions of "Staff Priorities - Fabio"
From SCECpedia
Jump to navigationJump to searchLine 1: | Line 1: | ||
== Yesterday == | == Yesterday == | ||
− | * | + | * UCSB code update |
− | * | + | ** syn1D updated |
− | ** | + | * Part-C script |
− | ** | + | ** Python code update |
− | * | + | ** Matlab code update |
− | ** | + | * ERI-SS |
− | ** | + | ** BBP NR with UCSB code |
− | * | + | ** Windows laptop back from JY |
+ | ** SCEC VDO working on Windows 7 laptop | ||
+ | ** Confirmed MS Office installed on laptop | ||
+ | ** Tried SCEC VDO on Mac OS X laptops | ||
== Today == | == Today == | ||
− | * | + | * ERI Workshop planning with PM, KM, DG |
− | * Part-C | + | * Run Part-C script for CG's simulations |
− | * | + | * UCSB code updates, source |
− | * | + | * Run validation runs for UCSB method |
== Blocked: == | == Blocked: == | ||
Line 21: | Line 24: | ||
== Followups: == | == Followups: == | ||
− | * | + | * Workshop Call at 11am |
− |
Revision as of 17:14, 28 August 2014
Contents
Yesterday
- UCSB code update
- syn1D updated
- Part-C script
- Python code update
- Matlab code update
- ERI-SS
- BBP NR with UCSB code
- Windows laptop back from JY
- SCEC VDO working on Windows 7 laptop
- Confirmed MS Office installed on laptop
- Tried SCEC VDO on Mac OS X laptops
Today
- ERI Workshop planning with PM, KM, DG
- Run Part-C script for CG's simulations
- UCSB code updates, source
- Run validation runs for UCSB method
Blocked:
- No
Followups:
- Workshop Call at 11am