Difference between revisions of "Staff Priorities - Phil"
From SCECpedia
Jump to navigationJump to searchLine 1: | Line 1: | ||
== Yesterday: == | == Yesterday: == | ||
− | * | + | * Finish Office move (Aug 29) |
− | * | + | * NCSA Call on CyberShake (11am) |
− | * | + | * BBP Poster w/ FS |
− | * | + | * CyberShake Poster w/ SC |
− | * | + | * Talk with JB on Movies/ShakeAlert |
− | * | + | * re-Install WebSite |
− | |||
== Today: == | == Today: == | ||
− | |||
* Contact MK on building response | * Contact MK on building response | ||
− | |||
* SEISM and GeoInfo Poster | * SEISM and GeoInfo Poster | ||
* CME Meeting Intro Slides | * CME Meeting Intro Slides | ||
− | |||
== Blocked: == | == Blocked: == |
Revision as of 16:20, 5 September 2014
Yesterday:
- Finish Office move (Aug 29)
- NCSA Call on CyberShake (11am)
- BBP Poster w/ FS
- CyberShake Poster w/ SC
- Talk with JB on Movies/ShakeAlert
- re-Install WebSite
Today:
- Contact MK on building response
- SEISM and GeoInfo Poster
- CME Meeting Intro Slides
Blocked:
- No
Followups:
- No
Pending:
- AC Report by Fall
- NVIDIA nomination
- Plan Fall project telecon schedule
- refine website use cases
- BBP Release planning
- Check on Kraken data storage status
- Test seism email list
- Fix issues with Geo email list
- PRAC Final Report (Nov 15)
- SResponse
- FW ABF into CME codebase