Difference between revisions of "Staff Priorities - Scott"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday ==
 
== Yesterday ==
*Calculated probabilistic results for all 14 sites with NGA comparisons
+
*Consulted with Gideon about Titan next steps
*Posted probabilistic results to wiki, emailed to group
+
*Sent out probabilistic results for CyberShake sites
*Added 1 Hz cost to wiki
+
*Worked on deterministic calculation
  
 
== Today ==
 
== Today ==
*Make SC travel plans
+
*Talk with Kevin about CB requests
*Perform deterministic calculation for 14 sites
+
*Create map in SCEC-VDO
 +
*Try deterministic calculation without including ruptures w/i 0.1 mag points
 
*Investigate 1 Hz results more closely to identify differences at 3 sec from 0.5 Hz
 
*Investigate 1 Hz results more closely to identify differences at 3 sec from 0.5 Hz
*Consult with Gideon about Titan next steps
+
*Paragraph to Phil about primary accomplishments on Titan in the last 3 months
*Integrate RotD50/RotD100 calculation into workflow
 
  
 
== Blocked ==
 
== Blocked ==
Line 15: Line 15:
  
 
== Follow-ups ==
 
== Follow-ups ==
*No
+
*HighF
 +
*CyberShake
  
 
== Areas of Responsibilities ==
 
== Areas of Responsibilities ==

Revision as of 17:19, 14 October 2014

Yesterday

  • Consulted with Gideon about Titan next steps
  • Sent out probabilistic results for CyberShake sites
  • Worked on deterministic calculation

Today

  • Talk with Kevin about CB requests
  • Create map in SCEC-VDO
  • Try deterministic calculation without including ruptures w/i 0.1 mag points
  • Investigate 1 Hz results more closely to identify differences at 3 sec from 0.5 Hz
  • Paragraph to Phil about primary accomplishments on Titan in the last 3 months

Blocked

  • No

Follow-ups

  • HighF
  • CyberShake

Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration