Difference between revisions of "Staff Priorities - Scott"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday ==
 
== Yesterday ==
*Updated wiki with some recent test results; focal DB slowed to a crawl
+
*Worked on presentation for HPCC booth
*Email hypocenter test results to group
+
*Emailed ISI for SC14 meeting
*Storage meeting
+
*Emailed Matt Norman for SC14 meeting
*Set up meeting time at SC14 with NCSA staff
+
*Confirmed Yifeng and Sridhar are working on integrating frequency-dependent Q and mu and lambda capture; sent them link to CyberShake SVN
*Started work on presentation for HPCC booth
 
*Started looking at changing seismogram synthesis convolution to use FFTs
 
  
 
== Today ==
 
== Today ==
*Continue work on presentation for HPCC booth
 
 
*Finish updating wiki with test results
 
*Finish updating wiki with test results
*Blue Waters back, so queue up 1 Hz PAS run
+
*Queue up 1 Hz PAS run
 +
*Continue looking at changing seismogram synthesis convolution to use FFTs
  
 
== Blocked ==
 
== Blocked ==
Line 16: Line 14:
  
 
== Follow-ups ==
 
== Follow-ups ==
*No
+
*Preparedness Lunch
  
 
== Areas of Responsibilities ==
 
== Areas of Responsibilities ==

Revision as of 18:29, 14 November 2014

Yesterday

  • Worked on presentation for HPCC booth
  • Emailed ISI for SC14 meeting
  • Emailed Matt Norman for SC14 meeting
  • Confirmed Yifeng and Sridhar are working on integrating frequency-dependent Q and mu and lambda capture; sent them link to CyberShake SVN

Today

  • Finish updating wiki with test results
  • Queue up 1 Hz PAS run
  • Continue looking at changing seismogram synthesis convolution to use FFTs

Blocked

  • No

Follow-ups

  • Preparedness Lunch

Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration