Difference between revisions of "Staff Priorities - David"

From SCECpedia
Jump to navigationJump to search
Line 28: Line 28:
 
== Followups ==  
 
== Followups ==  
  
- Three calls
+
- Three calls (maybe two)

Revision as of 18:06, 2 December 2014

Yesterday

- Fixing earthquake response site
    - Corrected the last, and final, issue with the site
    - Set the error messages to be hidden
- Continued working on prototype SCEC site
- Opened proposal review system, midnight last night

Today

- Web call @ 10:30
- High-F call @ 11
- UCVM call @ 12:30?
- Figure out where I left off on everything
    - Both CK and XS are reporting issues with UCVM on Yosemite
    - Couple of emails from TH
        - Fix case sensitivity for investigator find on review system
    - See a few e-mails from MB as well about stats page
        - Also need to update Google Analytics code on SO
- Fix LDAP pw issues
    - Was going to do this on Weds, but cannot access outside of USC campus
- Continue with prototype

Blocked

- No

Followups

- Three calls (maybe two)