Difference between revisions of "Staff Priorities - Scott"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday ==
 
== Yesterday ==
*HPC Planning meeting @ SCEC
+
*Fixed issue with RotD results in PAS 1 Hz workflow, completed
 +
*Discovered OLCF blocked access to previous scratch directory, emailed; am waiting for access to be restored
 +
*Queued up 2 tests of changing filtering parameters
 +
*David generated Vs profiles at UGMS 14 sites
  
 
== Today ==
 
== Today ==
 +
*Requested changes to plots from David
 
*Start working on CAAR proposal
 
*Start working on CAAR proposal
*Fix issues with RotD results in PAS 1 Hz workflow
 
*Transfer SBSM SGTs
 
*Begin 1 Hz SBSM run on Blue Waters
 
 
*Continue debugging DirectSynth
 
*Continue debugging DirectSynth
*Generate Vs profiles at UGMS 14 sites; include surface Vs on plots
+
*Send out draft application email to IHPCSS larger committee
*Email Tom list of USC CS courses for new grad students
+
*Email Tom list of CS courses for new grad students, comments on HPC Summer Schools
*Send out draft application email to former IHPCSS students
 
  
 
== Blocked ==
 
== Blocked ==
Line 16: Line 16:
  
 
== Follow-ups ==
 
== Follow-ups ==
*No
+
*HighF call
  
 
== Areas of Responsibilities ==
 
== Areas of Responsibilities ==

Revision as of 18:08, 3 February 2015

Yesterday

  • Fixed issue with RotD results in PAS 1 Hz workflow, completed
  • Discovered OLCF blocked access to previous scratch directory, emailed; am waiting for access to be restored
  • Queued up 2 tests of changing filtering parameters
  • David generated Vs profiles at UGMS 14 sites

Today

  • Requested changes to plots from David
  • Start working on CAAR proposal
  • Continue debugging DirectSynth
  • Send out draft application email to IHPCSS larger committee
  • Email Tom list of CS courses for new grad students, comments on HPC Summer Schools

Blocked

  • No

Follow-ups

  • HighF call

Areas of Responsibilities

  • CyberShake
  • Broadband CyberShake
  • Code migration