Difference between revisions of "Staff Priorities - Scott"
From SCECpedia
Jump to navigationJump to searchLine 2: | Line 2: | ||
*Fixed issue with RotD results in PAS 1 Hz workflow, completed | *Fixed issue with RotD results in PAS 1 Hz workflow, completed | ||
*Discovered OLCF blocked access to previous scratch directory, emailed; am waiting for access to be restored | *Discovered OLCF blocked access to previous scratch directory, emailed; am waiting for access to be restored | ||
+ | *Ran small test of changed filtering parameters; more testing needed | ||
*Queued up 2 tests of changing filtering parameters | *Queued up 2 tests of changing filtering parameters | ||
*David generated Vs profiles at UGMS 14 sites | *David generated Vs profiles at UGMS 14 sites |
Revision as of 18:08, 3 February 2015
Yesterday
- Fixed issue with RotD results in PAS 1 Hz workflow, completed
- Discovered OLCF blocked access to previous scratch directory, emailed; am waiting for access to be restored
- Ran small test of changed filtering parameters; more testing needed
- Queued up 2 tests of changing filtering parameters
- David generated Vs profiles at UGMS 14 sites
Today
- Requested changes to plots from David
- Start working on CAAR proposal
- Continue debugging DirectSynth
- Send out draft application email to IHPCSS larger committee
- Email Tom list of CS courses for new grad students, comments on HPC Summer Schools
Blocked
- No
Follow-ups
- HighF call
Areas of Responsibilities
- CyberShake
- Broadband CyberShake
- Code migration