Difference between revisions of "Broadband Platform 15 3 0"
From SCECpedia
Jump to navigationJump to searchLine 32: | Line 32: | ||
* <strike>Rename LOMAP model to NOCAL (#292) - 1 day</strike> | * <strike>Rename LOMAP model to NOCAL (#292) - 1 day</strike> | ||
* <strike>Include method name on html report in the outdata directory (#293) - 1 day</strike> | * <strike>Include method name on html report in the outdata directory (#293) - 1 day</strike> | ||
− | * Run test simulations for modelers | + | * Run test simulations for modelers - ongoing |
− | |||
* <strike>Improve BBP command-line interface (#291) - 1 day</strike> | * <strike>Improve BBP command-line interface (#291) - 1 day</strike> | ||
* Review test coverage (#128) - 2 days | * Review test coverage (#128) - 2 days |
Revision as of 22:22, 26 February 2015
Contents
Release Plan for BBP 15.3.0
Week 1/30
Finalize Intel compiler dependency removal (#227, #228)SRC/STL files on outdata (#277)SEED on outdata html file (#276)XML parsing problem (#285)
Week 2/6
- Run BBP on Mac OS X (#44) -
2 days1 day Integrate updated method from UCSB (#289) - 3 dayModify validation packages directory structure (#283) - 1 dayAlways use BBP_DATA_DIR (#158) - 1 day
Week 2/13
Use real station distances (#207) - 1 day- Division by zero issue (#284) - 1 day - cannot reproduce
Match module works with user-provided seismograms (#265) - 1 dayVersion number on XML file (#200) - 1 dayFix Header in RD50 files (#270) - 1 dayRemove unused codes and data files (#287) - 1 day- Better handle errors/ctrl-C (#113) - 1 day
- Update BBP distribution directory structure (#290) -
2 days1 day Show missing velocity models when selecting validation event (#275) - 1 day
Week 2/20
Rename LOMAP model to NOCAL (#292) - 1 dayInclude method name on html report in the outdata directory (#293) - 1 day- Run test simulations for modelers - ongoing
Improve BBP command-line interface (#291) - 1 day- Review test coverage (#128) - 2 days
Update SDSU codebase with latest February 2015 changes (#294) - 1 day
Week 2/27
- Code Freeze for Modelers (2/23)
- BBP First simulations (#269) - 2 days
- Documentation - 2 days
- BBP 15.3.0 wiki page
- Release Notes
- Mac OS X installation Guide
- BBP 15.3.0 Users' Guide
- Code Freeze for SCEC (2/26)
- Start West Part A & B validation suite for all methods 2/27
Week 3/6
- Make RC1 available to group for testing
- Collect feedback
Week 3/13
- Code Review 3/9
- Make RC2 available to group
Week 3/20
- Collect feedback from group
- Fix eventual issues
Week 3/27
- Rerun Part-A and Part-B West Validation
- Organize both public and private wiki
- Clean-up hypocenter
- Generate Virtual Image
- Generate Tar files
- Update online documentation
Week 3/31
- Post Distribution on Hypocenter
- Update Release Notes
- Write Release Announcement
- Email Release Announcement