Difference between revisions of "Staff Priorities - Phil"

From SCECpedia
Jump to navigationJump to search
Line 1: Line 1:
 
== Yesterday: ==
 
== Yesterday: ==
* Call with RT on U of M proposal
+
* Review DOE M8 storyboard
M8 Storyboard
+
* Interview with CG
* Meet with TJ
+
* Email with H and A
* Meet with TH
+
* Setup EC Meeting arrangements
* Setup new laptop
+
* BBP Install
 +
* Email JY about laptop
  
 
== Today: ==
 
== Today: ==
* Review DOE M8 storyboard
+
* SEISM2 @ 10:10
* Meeting with CG
+
* Web @ 1030
* Lunch with CG
+
* HighF @ 11
* Respond NG about Vs30
+
* M8 @ 115
* Setup EC Meeting arrangements
+
* Afternoon out
  
 
== Blocked: ==
 
== Blocked: ==
Line 17: Line 18:
  
 
== Followups: ==
 
== Followups: ==
* Lunch 12:05
+
* No
  
 
== Pending: ==
 
== Pending: ==

Revision as of 16:56, 7 April 2015

Yesterday:

  • Review DOE M8 storyboard
  • Interview with CG
  • Email with H and A
  • Setup EC Meeting arrangements
  • BBP Install
  • Email JY about laptop

Today:

  • SEISM2 @ 10:10
  • Web @ 1030
  • HighF @ 11
  • M8 @ 115
  • Afternoon out

Blocked:

  • No

Followups:

  • No

Pending:

  • FW ABF into CME codebase
  • BBP services docs
  • CVM Summary on wiki for EH

Related Entries